Follow Us:
+62 21 6124030
Liebert ITA

Liebert ITA 10KVA back up time 5 minutes

at full load 9KW, 3x1 / 1x1 phase, exclude material and instalation

1200610

Liebert ITA 10KVA/9KW UPS 230V/400V LCD standard model (no battery) 2U (adjustable to 1x1phase I/O and 3x1 phase I/O)  (no battery) (PN battery: 2351253 is required min. 2 units batteries); able to extend runtime battery. (Optional: rail kit untuk mounting ke Rack Server (PN: 2354061), each UPS & battery needs 1 unit rail kit)

2351253

External battery cabinet for Liebert ITA, 2U

2354061

Adjustable rail kit for Liebert ITA

TCITA10KVA

Testing and Commisioning (start up UPS) by Emerson on site

1200679

Liebert ITA 10KVA/9KW UPS 230V/400V LCD long backup model (no battery) 2U (adjustable to 1x1phase I/O and 3x1 phase I/O)  (no battery) (PN battery: 2351253 is required min. 2 units batteries); able to extend runtime battery. (Optional: rail kit untuk mounting ke Rack Server (PN: 2354061), each UPS & battery needs 1 unit rail kit)

Liebert ITA 16KVA back up time 8 minutes

at full load 14,4KW, 3x1 / 3x3 phase, exclude material and instalation

1200758

Liebert ITA 16KVA/14.4KW UPS 400V LCD long backup model (no battery) (adjustable to 3x1phase I/O and 3x3phase I/O), 3U, (no battery) (PN battery: 2351253 is required  min. 4 units batteries); LCD; able to extend runtime battery. (Optional: rail kit untuk mounting ke Rack Server (PN: 2354061), each UPS & battery needs 1 unit rail kit)

2351253

External battery cabinet for Liebert ITA, 2U

2354061

Adjustable rail kit for Liebert ITA

TCITA16KVA

Testing and Commisioning (start up UPS) by Emerson on site

Liebert ITA 20VA back up time 5 minutes

at full load 18KW, 3x1 / 3x3 phase, exclude material and instalation

1200782

Liebert ITA 20KVA/18KW UPS 400V LCD long backup model (no battery) (adjustable to 3x1phase I/O and 3x3phase I/O), 3U, (no battery) (PN battery: 2351253 is required  min. 4 units batteries); LCD; able to extend runtime battery. (Optional: rail kit untuk mounting ke Rack Server (PN: 2354061), each UPS & battery needs 1 unit rail kit)

2351253

External battery cabinet for Liebert ITA, 2U

2354061

Adjustable rail kit for Liebert ITA

TCITA20KVA

Testing and Commisioning (start up UPS) by Emerson on site